Selected projects
Twenty-two years,
nationwide delivery,
one accountable team.
Consultancy, remediation, dewatering and renewable energy commissions delivered the length and breadth of Ireland — each one led by the same multidisciplinary team from first survey to sign-off.
- Since
- 2002
- Offices
- Three
- Disciplines
- 12
- Coverage
- 32 counties
Case studies
Recent work.
22 projects
FeaturedSolar PV Commercial – Wicklow
The client requested the installation of a solar PV system design and installation at their commercial premises. Verdé designed a 10.44kWp solar PV system for installation.
Read case study
Construction Dewatering2025 ·
Construction Dewatering – Profile Park, Dublin
Verdé supported John Sisk & Son Ltd in the successful delivery of the first two phases of Vantage Data Centers’ DUB1 Campus , located at Profile Park, Dublin. Spanning 22 acres, this high-performance data center development delivers 52MW of IT capacity across two advanced facilit
Read case study
Construction Dewatering2025 ·
Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1
Verdé is delivering specialist environmental services to support Gilbert-Ash Ireland Ltd in the construction works at 137–140 Abbey Street Upper, Dublin 1 . This project requires comprehensive dewatering management, regulatory compliance, and environmental monitoring within a com
Read case study
Construction Dewatering2025 ·
Construction Dewatering – Ballymore Craddockstown Developments Limited, Kildare
Verdé is proud to continue supporting Ballymore Craddockstown Developments Limited in the ongoing works at Tipper West, Naas, Co. Kildare . This collaborative project highlights our dedication to environmentally responsible site services and long-term client partnerships.
Read case study
Solar PV2025 ·
94kWp Solar PV Commercial – Dublin
Solar PV installation works across two roofs using specialised flat roof system
Read case study
Construction Dewatering2024 ·
Construction Dewatering – Garda Ops Centre
Construction dewatering design, installation and management at the Garda Security Crime Operations Centre, Dublin 8, Ireland. The development was undertaken by the client, John Paul Construction.
Read case study
Construction Dewatering2024 ·
Construction Dewatering – Trinity College, Dublin
Verde provided construction dewatering services for JJ Rhatigan Building Contractors at the E3 Learning Foundry development in Trinity College Dublin. The site was across 2,200m2 and involved an 8 metre dig with seccant wall construction to facilitate the installation of a double
Read case study
Construction Dewatering2024 ·
Construction Dewatering – Meta HQ, Dublin
Construction dewatering at landmark site, Fibonacci Square, Ballsbridge, Dublin 4. Redevelopment of the former AIB Bank centre to the state-of-the-art, 2nd largest Meta (Facebook) campus in the world.
Read case study
Solar PV2024 ·
Solar PV Residential – Castlebar, Mayo
The client requested the installation of a solar PV system design and installation at their property. Verde designed a 6.2kWp solar PV system for installation on the client’s slate roof.
Read case study
Solar PV2024 ·
Solar PV Residential – Dublin
The client required a solar PV system design and installation at a newly renovated property. Verde designed a 8.8kWp solar PV system for installation on the client’s flat roof, using specialised anchors.
Read case study
Oil Spill Response2024 ·
Oil Spill Residential – Westmeath
A release of over 600 litres of kerosene fuel oil from a leak in the oil storage tank. Escaped oil migrated to neighbouring land and impacted beneath the insured property and house. The loss resulted in oil odours inside the house, with impact to the septic tank and percolation a
Read case study
Oil Spill Response2024 ·
Oil Spill Residential – Longford
A release of an unknown volume of kerosene fuel oil occurred from an underground oil line fitting external to the house. The loss resulted in oil odours inside the house, with oil migrating around the rear and side of the building, as well as underneath approximately half of the
Read case study
Oil Spill Response2024 ·
Oil Spill Midwestern Hospital
A release of 4,500 litres of light fuel oil occurred from a fracture in a fuel line inside a plant room. The loss impacted the plant room and adjoining physiotherapy room, resulting in forced closure of the department.
Read case study
Hydrogeology & Water2023 ·
Hydrogeological and Appropriate Assessment
Undertake an Environmental/ Hydrogeological site investigation and Appropriate Assessment for a proposed cemetery development on an existing greenfield site.
Read case study
Hydrogeology & Water2023 ·
Lake Water Quality Monitoring
Verde samplers trained in boat handling and sea survival skills obtain water quality samples and field readings from open water and shore locations at specified locations on the lakes using quality assured sampling methods to ensure the samples are representative of the water bod
Read case study
Hydrogeology & Water2023 ·
Groundwater Resources Development
Undertake a Hydrogeological review of available information to determine the suitability of developing a further groundwater resource to an existing well field on the caravan park site.
Read case study
Hydrogeology & Water2023 ·
Soil, Geology & Hydrogeology Chapter for EIS
Supervision of groundwater well drilling and installation for a production well to augment a mains water supply to the anaerobic digester development.
Read case study
Environmental Consultancy2023 ·
Soil Waste Classification – Collen Construction
Excavation of fourteen trial pits; locations were selected at key strategic positions around the site and trial pits generally extended down to depths of between 2.0 and 3.0m below ground level.
Read case study
Environmental Consultancy2023 ·
Environmental Services
Construction and Demolition Waste Management Plan – Advise on key environmental obligations and waste management procedures that apply to contractor organisations, their subcontractors and employees while completing construction and demolition activities on the proposed developme
Read case study
Environmental Consultancy2023 ·
Phase II Environmental Site Assessment
Obtaining representative soil samples to determine potential impact to the land from the discharge.
Read case study
Environmental Consultancy2023 ·
Environmental Services to Multiple Construction Sites Nationwide
Real time noise and vibration monitoring at site boundaries or at sensitive neighbouring properties.
Read case study
Air & Occupational Hygiene2017 ·
Ambient Air and Occupational Hygiene Monitoring
Continuous monitoring of particulate matter PM 10 , PM 5 and PM 1 within the site and at boundary locations. This included a telemetry connection to allow off-site viewing and real-time data analysis.
Read case studyWhere we work
Every county, one team.
Featured project
Trinity College Dublin — Construction Dewatering
Design, monitoring and discharge management for construction dewatering on a landmark Trinity College Dublin development.
Coverage markers are representative regional examples, not verified client site pins.
Jump to a project
